Air Conditioning
APS Air Tech Engineering Solutions
DESIGN – SCOPE OF WORK
-
Site Survey
-
Heat Load Calculation
-
Equipment Selection – RAC, LAC, VRF & VRV
-
Preparing BOQ (Bill of Quantity)
-
List of Makes To Be Used
-
Fresh Air arrangement – With TFA and With HRF
-
Air Distribution (Duct Layout)
-
Electrical Load Calculation
-
Proposed Route of Copper Refrigerant Piping
-
Proposed Location of Evaporator & Condenser
-
Air Balancing Testing and Pressure Testing